Martin® Air Cannons Optimize Material Flow
Product Types Used Air Cannon Solutions , Air Cannons
[unset] Installation
Industry Cement
Customer Drake Cement in Paulden, AZ

Problem

Drake Cement specializes in high quality Portland cement products for the North American market.

The Drake Cement plant began operations in 2011, specializing in high quality Portland cement products for the North American market. Located about 10 miles north of Paulden, AZ, the facility includes a state-of-the-art, six-stage precalciner/preheater with a rated capacity of 660,000 tons of clinker per year. Efficient material flow is a key component of Drake's dry-process manufacturing, and accumulation in storage bins, process vessels or feed pipes could choke even this well designed system.

Solution

The cannons were positioned in the lower part of the pre- heat tower, near the automatic sampler.

Like most new cement plants, the Drake facility required some fine tuning of material flow to optimize the process. Martin Engineering visited the site and helped Drake pinpoint the optimum locations for air cannons in the plant's additive silos and in the bottom part of the preheater, as well as the calciner and cyclones. Martin installed a total of 53 Martin® Air Cannons to prevent accumulations and ensure process flow, with the timing and firing sequence determined primarily by programmable logic control.

The Martin® Air Cannons at Drake Cement fire a powerful discharge of compressed air to remove material adhered to the vessel walls. The air cannon design requires no high-temperature discharge pipes or special mounting plates, and discharge nozzles are embedded directly in refractory linings. All of the units in the network are equipped with valves designed to deliver reliable performance and long service life.

Results

Several of the cannons were located in the entry to the kiln, cooler inlet and the preheater tower.

The efforts at Drake Cement have been so successful that the plant is now running at its rated capacity of about 100 short tons per hour. With no shutdowns for manual cleanout after the first year of operation, the facility has avoided the lost production time and maintenance costs associated with excessive material buildup.

Resources

PDF - Printable Version of Case Study Download
Brochure - Air Cannons Download
Brochure - Martin Engineering Corporate Profile Download

View Additional Resources

We've solved your problem somewhere before!

While your problem seems unique and frustrating, with 70+ years of solving similar problems around the world, and with the most experienced and educated people on our teams, we can assure you that we’ve “Been There, Done That.” At least close enough to know what needs to be done next and adjust for your situation.

Put Us To The Test For Free! Let Us Give You a Solution.
Call Us Today +27 (0) 13 656-5135